
OPERATION
, begin by assembling the mixing container.
smoothie maker, begin by assembling the mixing container.smoothie maker
1. Position the rubber gasket down onto the circular fl at surface in the blade base.
lade base on the bottom of the mixing
base counter-clockwise until tightened onto the mixing
container. Make sure that container
the blade base is tightly fastened to the
and that the rubber gasket is
properly compressed between the
the lid onto the top of the mixing jar and twist the lid clockwise until it
locks into position. The lip on the lid should line up with the pour spout on the
container. This will engage the safety switch. Place the clear lid cap in the center
of the lid or place the stir stick through the center of the lid if blending liquids
or frozen drinks. NOTE: The lid and container must be locked in place for the
onto the motor base so that the bottom of the blade
base is sitting fl at on the motor base. Twist clockwise until the container locks
into place. The indicator light on the control panel will light up indicating the unit
is ready to turn on. The dispensing valve should line up with the auto-powered
5. Once the lid and the goblet are locked into place the ready light will come on
indicating all safety switches are engaged.
e active the indicator light will come on. This in
rn on. If indicator light is not on
Kommentare zu diesen Handbüchern